Media Summary: Or driving the entire length of State Route This video follows WA 520 East, from Seattle to Redmond. Includes footage of the Evergreen Point Estrada: Last drive over Harbor Bridge before it closes in two weeks Aug19,2025

Goodbye 520 Bridge Final Drive - Detailed Analysis & Overview

Or driving the entire length of State Route This video follows WA 520 East, from Seattle to Redmond. Includes footage of the Evergreen Point Estrada: Last drive over Harbor Bridge before it closes in two weeks Aug19,2025 Even at 300% speed this is far from the most exciting video I have uploaded. May 2017 progress of construction on the new 60MPH at three times speed equals an equivalent of 180MPH - I doubt my Ford could pull that off in real life. West bound thenĀ ... Attention drivers and cyclists in Seattle, the

Washington State Department of Transportation releases uploaded by gravity trap. visuals by ethan scoma. A trip on SR 520 and across the Evergreen

Photo Gallery

Goodbye 520 bridge. Final drive across this bridge
Last drive on 520
My First Drive on the Tolled 520 Bridge
Time Lapse Kirkland, 405, I90, 5, 520
The new 520 Bridge Drive - April 11, 2016
WA 520 East, Seattle To Redmond
Drive on 520 bridge near Seattle, WA
Estrada: Last drive over Harbor Bridge before it closes in two weeks Aug19,2025
520 Bridge going East
SR 520 floating bridge drive with traffic!
Leap Years day 520 bridge drive - west then East
Crossing 520 bridge during a windstorm
Sponsored
Sponsored
View Detailed Profile
Sponsored
Sponsored